Concrete is expensive. According to the National Ready Mix Concrete Association, the cost of concrete is $108 per cubic yard. On top of this is the cost of delivery fees, truck rentals, driver pay, loading/unloading workers, etc. And this doesn't even include the cost of time spent during the delivery process testing and checking the quality of the concrete to make sure it arrives at the jobsite at the right consistency and quality required for the job.
Loading related content...